GMP Upgrade

Project Overview
The primary purpose of this project was to bring the Lawrence Labs Warehouse facilities within required temperature and humidity limits to achieve Good Manufacturing Practices and Distribution Standards.
 
Project Detail
A new environmental air handling system was designed for two high bay warehouses used for the storage of pharmaceutical products to ensure that the temperature remained between the 15°C and 25°C at any location within the warehouses.  

The system involved the installation of two new AHUs with temperature and humidity control supplying high velocity ducting with directional air nozzles to provide an even air flow to all areas and heights within each warehouse.

Loading bays were also reconstructed to prevent heat loss or gain during loading/unloading operation together with wall and floor finished upgrade.

Twenty four hour temperature mapping was also introduced to validate warehouse performance levels. 
 
Pharmaceutical