Pilot Plant ATEX Compliance

Project Overview
The primary purpose of this project was to bring the Henkel pilot plant air conditioning up to ATEX standards. 
 
Project Detail
For the ATEX compliance upgrade a new air conditioning system was designed and installed to operate in two modes: standby and production.

The two modes operated with varying air change rates which required additional control to balance room pressures.

All new HVAC equipment, including filters, fans, actuators, heater batteries, supply grills, duct work, valves, etc. were ATEX certified.
 
Others