Vaporiser Installation

Malone Group designed and installed a CO2 vaporiser in Diageo's Kilkenny Brewery.
 

  • Commissioning and Validation Management
  • Construction Management
  • Design coordination
  • Design Risk Assessments
  • Detailed engineering design
  • Preparation of preliminary health & safety plan
  • Turnkey Installation


A new steam/liquid CO2 vaporisation system was installed at Diageo’s Kilkenny Brewery with piped links to existing liquid CO2 bulk storage tanks, vaporizers and production distribution mains to provide additional capacity and flexibility of operation.

The new installation included steam vaporizers, liquid and gas CO2 pipework, control valves and safety systems with pressure control.  Due to the extreme low temperatures and high pressure requirements for handling liquid CO2 a critical part of this project was to carry out an in depth HAZARD analysis and review of standard operating procedures.

This was carried out by the Malone Group project team together with key Diageo personnel to ensure that the design, equipment selection and management control provided a safe operational and environmental system during all phases of the installation while continuing to support brewery production

 

Food and Drink