PSDP for Laminar Downflow Cabinet

Fort Dodge Laboratories Ireland Limited is located in the Finisklin Business Park, Sligo and has been in operation since 1990.

The operation employs around 100 persons and manufacturers a range of both modified live (MLV) and inactivated veterinary vaccines.

These vaccines are for the protection of the client animal against diseases caused by a specific range of viruses and/or bacteria.

Malone Group was appointed PSDP for a LDC replacement project.
 

  • Advise on Construction Regulations
  • Design coordination
  • Design Risk Assessments
  • PSDP
  • As PSDP we carried out an initial site visit and meeting with the client. The client was briefed on their tasks under the construction regulations. We assisted in the appointment and notification process.

 

In consultation with the client and project designers we developed a preliminary health and safety plan for the tender process. We coordinated and reviewed design risk assessments associated with the project. Part our scope as PSDP was also to liaise with the PSCS to ensure they were in compliance with their statutory responsibilities.

We also allow for monitoring of safety performance during construction phase, ensuring construction issues are dealt with design level. The final part of the process is handover of the completed safety file.
 

Others